The result of the reconstruction of platforms of truck tippers GUAR-15, GUAR-30 is provision of unloading of semi-trailer long-wheelbase trucks of type KAMAZ-5412 + OdAZ-9380, MAZ-6422 + MAZ-9398 (MAZ-54323 + MAZ-9758) with total weight of up to 45 t. the Reconstruction is carried out by replacing the existing hydraulic lift to more powerful one and by extending tipping platform by 3-4 m and increasing the lifting capacity up to 40 tons. Upon customer request, a new oil-pumping station can be supplied. To see pictures and video, go to Gallery.
Upon customer request, a representative of service provider may visit the site to determine technical solutions for the reconstruction as well as to carry out supervision.
![]() |
![]() |
Name of equipment | Reference code |
Set of units and parts for reconstruction of truck tipper GUAR 30 (with lifting capacity 40 t, extension of platform by 4 m) | CHRP 00 |
Set of units and parts for reconstruction of truck tipper GUAR 30 (with lifting capacity 40 t, extension of platform by 3 m, installation of hydraulic cylinders) | CHRP 01 |
Set of units and parts for reconstruction of travelling inclined truck tipper GUAR -15 (increasing lifting capacity up to 25 t, installation of hydraulic cylinders) | RAG-15М |
Set of units and parts for reconstruction of stationary truck tipper GUAR -15N(S) (increasing lifting capacity up to 25 t, installation of hydraulic cylinders) | RAG-15M-1 |
Set of units and parts for reconstruction of travelling truck tipper GUAR (increasing lifting capacity up to 25 t, extension of platform by 3 m) | RAG-15M-2 |
Reference code | Description | Set of supply |
CHRP 00 | The set is designed for reconstruction of GUAR-30 by installing two cylinders (SH1-P1330.00.000-03), strengthening and extending the platform by 4 m with increasing lifting capacity from 30 to 40 tons (stationary). |
|
CHRP 01 | The set is designed for reconstruction of GUAR-30 by installing two hydraulic cylinders (SH1-P1330.00.000-03), strengthening and extending the platform by 3 m with increasing lifting capacity from 30 to 40 tons (stationary). |
|
RAG-15M | The set is designed for reconstruction of GUAR-15 by installing two hydraulic cylinders (796-026), strengthening the platform and increasing lifting capacity from 15 to 25 tons (travelling). |
|
RAG-15M-1 | The set is designed for reconstruction of GUAR-15N(S) by installing two hydraulic cylinders (796-026-01), strengthening the platform and increasing lifting capacity from 15 to 25 tons (stationary). |
|
RAG-15M-2 | The set is designed for reconstruction of GUAR-15 by installing two hydraulic cylinders (796-026-04), strengthening and extending the platform by 3 m and increasing lifting capacity from 15 to 25 tons (stationary). |
|